Whitney Interstate Industrial Park Property Details

 

 
 

 
 

 

Whitney Interstate Industrial Park provides end-users a unique opportunity to position their business in the epicenter of Southwest Florida’s record-setting growth, in immediate vicinity of:

 

 
   

w SWF International Airport

w Gulf Coast Town Center

w Florida Gulf Coast University

w Germain Arena

w Miromar Outlet Mall

w International Design Center

w Research Park

w Signalized intersection at Alico Road

w 2.2 miles to U.S. 41

w 1.3 miles to I-75 interchange 128

w 3.2 miles to SW Florida International Airport

w Strategic location to serve the entire region efficiently and profitably

 
 

 

w    Location:  Lee Road north of Alico Road signalized intersection 1.3± miles west of Interstate 75 Exit 128 interchange in South Fort Myers, Lee County, Florida.  Alico Road intersects with U.S. 41 2.2± miles to the west.  The new entrance to SW Florida International Airport is 3.2± miles away from the site via Alico Road east to Treeline Road/Ben Hill Griffin Parkway.

 

w    Property:  30.1± acres of cleared former pasture land with a generally level topography having spot elevations typically ranging between 15 feet and 17 feet.  The assemblage site of three adjoining ten-acre tracts, Parcels K, L, and M, is rectangular in shape having an East-to-West depth of 838± feet, and a North-to-South axis fronting on the western right-of-way of Lee Road for 1,564± feet.
 

w    Land Use Area:  Site is located in an INDUSTRIAL DEVELOPMENT Land Use Area of the Lee County Comprehensive Land Use Plan.
 

w    Entitlements:  Site is part of the 250± acres of Alico Road 254 Industrial Subdivision Industrial Planned Development (IPD) approved and adopted by the Board of County Commissioners of Lee County as Zoning Resolution Number Z-04-055 on November 15, 2004.  This IPD zoning provides for Commercial Uses along the Alico Road frontage, restricted industrial uses within the northern-most Residential Buffer Area of the 250± acres, and Heavy Industrial Uses with a maximum building height of 45 feet for interior parcels, including the Subject Property 30.1± acres.
 

w    Infrastructure:  Lee Road is a two-laned North-South road with asphalt pavement within a 60-foot wide Access and Utility Easement extending north from its signalized intersection with Alico Road to a cul-de-sac at the northern end of the IPD.  Drainage ditches border both sides of Lee Road and tie into a Master Surface Water Management System for the IPD.  Municipal potable water and sanitary sewer are provided to the IPD by Lee County Utilities.  All utilities are completed, ready for hook-up.
 

w    Subdivision Plan:  Site will be developed into Whitney Interstate Industrial Park, a platted subdivision of 19 lots for Heavy Industrial uses.  Each lot has a minimum net area of one ± acre with a Central Dry Retention Drainage Area.

 
     
 

 Lot Numbers and Site Plan breakdown for the Alico Property

(Click on the image to enlarge it or download the pdf file by clicking below)

 

Overall Site Plan

Lot # 1-19

 

Download the PDF here

Site Plan

Lot # 1, 2, 10, 19

(# 8, 9, 11-18)

Download the PDF here.

Site Plan

Lot # 4, 5, 6

 

Download the PDF here.

Site Plan

Lot # 3

(#7)

 

Download the PDF here.